A weekly operations brief for excavation and sitework contractors
The goal: Keep heavy equipment working instead of waiting, finish earthwork on schedule and keep every trench safe.
From week 4 you get a brief built from your own records: your goals, the KPIs with their assumptions, the options in front of you with their guardrails, and a 30-day agenda. Bifrost answers your team's questions about the same records, and shows how each number was worked out. We review it with you every week.
What you see
Bifrost in the Watch Tower Console
For owners, superintendents and equipment managers at excavation and civil sitework firms
What it looks like for excavation and sitework contractors
The KPIs, cards and questions below are examples of what we set up with you. The names and units are made up.
KPIs, with the assumption behind each
Cards on the work tracker
- Move the idle dozer to the subdivision jobEquipment manager · due Tue · Dozer D6-2
- Set the trench box before the crew goes below five feet on the sewer runSuperintendent · due Today · Trench box TB-3
- Fix the excavator's recurring hydraulic faultMechanic · due Thu · Excavator 320-1
Records you already keep
- Equipment hour meter readings
- Daily trench and excavation inspection logs
- Job-cost reports
- Fuel and maintenance records
Assets in the register
- Excavators, dozers and loaders
- Trench boxes and shoring
- Job sites
- Operators and competent persons
Questions your team can ask Bifrost
- Which machines worked under half their scheduled hours last month?
- On which days was a trench entered without a logged inspection?
- What did breakdowns cost us in lost hours this quarter?
Bifrost answers from the records in your own workspace and shows how each number was worked out.
How it runs
Weekly brief, step by step
- Your records come in during week 1 and your goals and KPIs are set in week 2.
- Your first brief arrives in week 4, with the assumptions behind every number.
- Your team asks Bifrost about your own records, and each answer shows the records it used.
- We hold the weekly review with you and update the brief from what moved.
The barriers this crosses
- Use: What exactly would I use it for? We name the specific uses by role and by industry: the decision, the calculation, the plan, the brief.
- Consistency: Will this still be useful next week? We design AI into the daily system: the Console, the toolkits and the career plan people come back to, with customer success that follows up.
Rules and facts for excavation and sitework contractors
What the records have to show
- Employees in an excavation must be protected from cave-ins by an adequate protective system, except in excavations made entirely in stable rock or less than five feet deep where a competent person finds no sign of a potential cave-in.Source: 29 CFR 1926.652(a)(1), Protection of employees in excavations
- A competent person must inspect excavations, the adjacent areas and protective systems daily, before the start of work and as needed during the shift.Source: 29 CFR 1926.651(k)(1), Specific excavation requirements
- Trench excavations four feet or more deep must have a stairway, ladder, ramp or other safe means of egress within 25 feet of lateral travel.Source: 29 CFR 1926.651(c)(2), Specific excavation requirements
A summary for planning work, not legal advice. Check the source for the full rule and any state requirements.
Start
See it on a sample company first
Founding 10
$2,000 for setup and the first 3 months of Watch Tower, then $250/month. Ten places. We set up your team, goals and KPIs, asset register, map and work tracker with you, then review it with you every week.
Hardware implementation is quoted separately. Start with the demo; you can order from inside it.Open the free demoQuestions
Common questions
Do the machines need telematics for this?
No. Hour meter readings and daily logs are enough to start. If your machines already export telematics, we can read the export too.
Where do the answers come from?
Only from the records in your own workspace. Bifrost answers questions about them and shows the records it used and how each number was worked out, so your team can check it.
What does a brief look like before we pay?
Open the free demo: it runs on a fictional company in your industry, with a sample brief you can read end to end.
What does Watch Tower cost for excavation and sitework contractors?
Founding 10 covers setup and the first 3 months in one payment, then a monthly price; the numbers are on this page and on the pricing page inside the demo. Hardware implementation is quoted separately.
More
More for excavation and sitework contractors
- A work tracker for excavation and sitework contractors
- An asset register and map for excavation and sitework contractors
- Goals and KPIs for excavation and sitework contractors, with the assumptions written down
- Everything for excavation and sitework contractors
- Read a sample week-4 brief
Weekly brief in other industries
- Weekly brief for trucking companies
- Weekly brief for freight brokers
- Weekly brief for 3PL warehouses
- Weekly brief for cold-chain and reefer carriers
- Weekly brief for general contractors
- Weekly brief for HVAC contractors
- Weekly brief for electrical contractors
- Weekly brief for farms and agribusinesses
- Weekly brief for cattle ranches and feedlots
- Weekly brief for food and beverage processors