- Industries
- General contractors
- Goals and KPIs
Watch Tower · Applied Intelligence for your Business · General contractors
Goals and KPIs for general contractors, with the assumptions written down
The goal: Finish jobs on schedule and on budget, with every crew working safely and every piece of equipment where it's needed.
We agree three to five goals with you, each with one KPI. Every KPI is written out: what it measures, the record it comes from, the period, where it stands today and the assumptions behind the number, plus the guardrails that mustn't get worse while you work on the goal.
What you see
Home in the Watch Tower Console
For owners, project managers and safety leads at general contracting firms
What it looks like for general contractors
The KPIs, cards and questions below are examples of what we set up with you. The names and units are made up.
KPIs, with the assumption behind each
Cards on the work tracker
- Get the competent person's scaffold check logged before Monday's shiftSite superintendent · due Mon · Job: Riverside clinic
- Return the idle rented excavator or move it to the next jobEquipment manager · due Wed · Excavator R-12
- Update the cost to complete after the steel change orderProject manager · due Fri · Job: Elm Street retail
Records you already keep
- Job-cost reports
- Daily logs and inspection checklists
- Equipment lists and rental agreements
- Subcontractor schedules
Assets in the register
- Job sites
- Owned and rented equipment
- Crews and foremen
- Subcontractors
Questions your team can ask Bifrost
- Which jobs are behind their baseline, and by how many days?
- Which rented equipment sat idle for more than five days last month?
- How many shifts started without a logged scaffold check this quarter?
Bifrost answers from the records in your own workspace and shows how each number was worked out.
How it runs
Goals and KPIs, step by step
- Start from one goal or decision that matters this quarter.
- Pick one KPI for it, from records you already keep.
- Write down the definition, the period and every assumption behind the number, so anyone can check it.
- Set the guardrails, then review the numbers with us every week.
The barriers this crosses
- Intent: Why do I need AI at all? We start from the person's own goal, decision or task and show what changes for that goal, in their words.
- Use: What exactly would I use it for? We name the specific uses by role and by industry: the decision, the calculation, the plan, the brief.
Rules and facts for general contractors
What the records have to show
- Each employee on a walking or working surface with an unprotected side or edge six feet or more above a lower level must be protected from falling by a guardrail, safety net or personal fall arrest system.Source: 29 CFR 1926.501(b)(1), Duty to have fall protection
- Scaffolds and their components must be inspected for visible defects by a competent person before each work shift.Source: 29 CFR 1926.451(f)(3), Scaffolds
- OSHA's "Focus Four" construction hazards are falls, caught-in or -between, struck-by and electrocution.Source: OSHA, Construction Focus Four training
A summary for planning work, not legal advice. Check the source for the full rule and any state requirements.
Start
See it on a sample company first
Founding 10
$2,000 for setup and the first 3 months of Watch Tower, then $250/month. Ten places. We set up your team, goals and KPIs, asset register, map and work tracker with you, then review it with you every week.
Hardware implementation is quoted separately. Start with the demo; you can order from inside it.Open the free demoQuestions
Common questions
Does this replace our construction management software?
No. It reads your job-cost reports, logs and equipment lists and puts the goals, the actions and the weekly review in one place. Keep the tools your field team already uses.
Why write the assumptions next to each number?
Because a KPI people can't check is a KPI people stop trusting. Each number in your Console shows the record it came from and the assumptions behind it, so a manager and a dispatcher or foreman read it the same way.
We don't have clean data. Can we still set KPIs?
Yes. We start from the records you have and write down what's missing as an assumption. As the records get better, the KPI gets better, and the review tracks that too.
What does Watch Tower cost for general contractors?
Founding 10 covers setup and the first 3 months in one payment, then a monthly price; the numbers are on this page and on the pricing page inside the demo. Hardware implementation is quoted separately.
More
More for general contractors
- A work tracker for general contractors
- An asset register and map for general contractors
- A weekly operations brief for general contractors
- Everything for general contractors
- Read a sample week-4 brief
Goals and KPIs in other industries
- Goals and KPIs for trucking companies
- Goals and KPIs for freight brokers
- Goals and KPIs for 3PL warehouses
- Goals and KPIs for cold-chain and reefer carriers
- Goals and KPIs for HVAC contractors
- Goals and KPIs for electrical contractors
- Goals and KPIs for excavation and sitework contractors
- Goals and KPIs for farms and agribusinesses
- Goals and KPIs for cattle ranches and feedlots
- Goals and KPIs for food and beverage processors