- Industries
- Electrical contractors
- Goals and KPIs
Watch Tower · Applied Intelligence for your Business · Electrical contractors
Goals and KPIs for electrical contractors, with the assumptions written down
The goal: Finish jobs on time and on budget, keep every crew safe around energized equipment, and keep code knowledge current.
We agree three to five goals with you, each with one KPI. Every KPI is written out: what it measures, the record it comes from, the period, where it stands today and the assumptions behind the number, plus the guardrails that mustn't get worse while you work on the goal.
What you see
Home in the Watch Tower Console
For owners, project managers and safety leads at electrical contracting firms
What it looks like for electrical contractors
The KPIs, cards and questions below are examples of what we set up with you. The names and units are made up.
KPIs, with the assumption behind each
Cards on the work tracker
- Refresh lockout/tagout training for the two new apprenticesSafety lead · due Thu · Crew B
- Send the overdue meters for calibrationTool room lead · due Wed · Meters 4, 9
- Re-forecast labor on the warehouse job after the panel changeProject manager · due Fri · Job: Northgate warehouse
Records you already keep
- Job-cost and labor reports
- Lockout/tagout procedures and training records
- Tool and meter calibration lists
- Material orders
Assets in the register
- Job sites
- Vans and lifts
- Meters and testing equipment
- Electricians and their licenses
Questions your team can ask Bifrost
- Which jobs are over their labor estimate, and by how much?
- Whose safety training lapses in the next 30 days?
- Which meters are past calibration?
Bifrost answers from the records in your own workspace and shows how each number was worked out.
How it runs
Goals and KPIs, step by step
- Start from one goal or decision that matters this quarter.
- Pick one KPI for it, from records you already keep.
- Write down the definition, the period and every assumption behind the number, so anyone can check it.
- Set the guardrails, then review the numbers with us every week.
The barriers this crosses
- Intent: Why do I need AI at all? We start from the person's own goal, decision or task and show what changes for that goal, in their words.
- Use: What exactly would I use it for? We name the specific uses by role and by industry: the decision, the calculation, the plan, the brief.
Rules and facts for electrical contractors
What the records have to show
- OSHA's lockout/tagout standard requires employers to establish an energy control program, with written procedures and employee training, for servicing and maintenance where unexpected energization could cause injury.Source: 29 CFR 1910.147, The control of hazardous energy
- The National Electrical Code (NFPA 70) is revised on a three-year cycle, and states and cities adopt editions on their own schedules.Source: NFPA 70, National Electrical Code
A summary for planning work, not legal advice. Check the source for the full rule and any state requirements.
Start
See it on a sample company first
Founding 10
$2,000 for setup and the first 3 months of Watch Tower, then $250/month. Ten places. We set up your team, goals and KPIs, asset register, map and work tracker with you, then review it with you every week.
Hardware implementation is quoted separately. Start with the demo; you can order from inside it.Open the free demoQuestions
Common questions
Can it hold our safety procedures?
It holds the actions and records around them: who's trained, what's due and which job it's for. Your written procedures stay where you keep them, linked from the cards.
Why write the assumptions next to each number?
Because a KPI people can't check is a KPI people stop trusting. Each number in your Console shows the record it came from and the assumptions behind it, so a manager and a dispatcher or foreman read it the same way.
We don't have clean data. Can we still set KPIs?
Yes. We start from the records you have and write down what's missing as an assumption. As the records get better, the KPI gets better, and the review tracks that too.
What does Watch Tower cost for electrical contractors?
Founding 10 covers setup and the first 3 months in one payment, then a monthly price; the numbers are on this page and on the pricing page inside the demo. Hardware implementation is quoted separately.
More
More for electrical contractors
- A work tracker for electrical contractors
- An asset register and map for electrical contractors
- A weekly operations brief for electrical contractors
- Everything for electrical contractors
- Read a sample week-4 brief
Goals and KPIs in other industries
- Goals and KPIs for trucking companies
- Goals and KPIs for freight brokers
- Goals and KPIs for 3PL warehouses
- Goals and KPIs for cold-chain and reefer carriers
- Goals and KPIs for general contractors
- Goals and KPIs for HVAC contractors
- Goals and KPIs for excavation and sitework contractors
- Goals and KPIs for farms and agribusinesses
- Goals and KPIs for cattle ranches and feedlots
- Goals and KPIs for food and beverage processors